- NEW: Added "bookmark" records to Dashboard and RSS events
- NEW: Added a setting to admin account section to turn off the daily progress report
- CHANGE: Updated payment process to ensure the correct calculations are used when changing plans
- CHANGE: Improved "File Size Limit" reached error to display more information on how to upgrade to a different plan
- CHANGE: Updated order of content in event email notifications
- CHANGE: Updated tasks so users associated with the parent task can add new subtasks
- CHANGE: Updated issue with timecard add new panel not getting reset correctly when an expense was added
- CHANGE: Improved Tasks Edit/Update process to ensure dates are set correctly when adjusting associated subtasks and/or parent task dates
- FIX: Fixed small glitch with long lists of tasks not loading correctly in IE9
- FIX: Fixed issue with subtasks not being disabled/shown as checked when the parent task was marked complete
- FIX: Fixed issue with tasks not correctly hiding delete rows if subtasks existed
- FIX: Fixed issue with tasks section when sorting by Project title
- FIX: Fixed character linking issue in documents
- FIX: Fixed problem with document notification emails not being formatted correctly if the associated comment had really long text
- FIX: Fixed issue with version count not showing up correctly in the documents section when the discussion section is turned off
- FIX: Fixed issue with project settings showing the loading panel when the page is first loaded
- FIX: Recent Activities log was not getting updated correctly to indicate a new discussion when a document or design was added that included a comment
- FIX: Fixed issue with Gantt chart not updating correctly when adjusting the dates for subtasks
- FIX: Fixed issue with project names not wrapping correctly in the address book "projects" panel
- FIX: Fixed issue with Hours and Fees report not filtering the date range correctly
Projecturf 3.2.0 - August 16, 2011
- NEW: Drag and drop tasks and subtasks on the Gantt chart, and resize them to extend or shorten the timelines instantly
- NEW: New project calendar feed option when subscribing to calendar to sync all tasks and subtasks
- NEW: Added date range filter to timecards
- NEW: Added "Display update notifications" to the account settings page so users can turn off update notices
- NEW: Add "expense" option to Timecards
- NEW: Added RSS feed to our blog
- NEW: HTML email format for system emails
- NEW: Daily progress report email sent daily to include completed and upcoming tasks, tickets and events
- CHANGE: Updated discussion reply process to make replying via email easier (removed "reply between lines")
- CHANGE: Updated subscription process to give 1 month free when upgrading to annual subscription
- CHANGE: Improved the "Hours and Fees" report to correctly display billable/total hours down to the minute
- CHANGE: Update Calendar "attendees" drop down so it works correctly when the filter is set to Tasks or All
- FIX: Fixed design previews not working if the associated group name included an invalid character
- FIX: Fixed link overflow issue with very long URLs in discussions
- FIX: Fix issue with Global Calendar events displaying incorrectly when viewing an individual project (happens when toggling from the project level to the global level using the browser back button)
Projecturf 3.1.0 - June 1, 2011
- NEW: Added Calendar printing for month view
- NEW: Added the ability to link Vimeo and YouTube videos in Documents and play them inside Projecturf
- NEW: Added "Send Registration" option to the Contacts and Address Book section to quickly resend the registration email for unregistered users
- NEW: Added the project start and end dates to the calendar automatically
- NEW: Updated Designs section to allow clicking through multiple designs in the same group without having to close the preview window
- CHANGE: Project assignment option in the Address Book is only displayed for users associated with projects
- CHANGE: Updated Calendar subscription to include tasks with calendar feed
- FIX: Issue with charts not displaying properly in IE9
- FIX: Updated popup window to ensure new windows are opened for each Whiteboard or Report opened
- FIX: Fixed process to ensure document/design approval emails are not sent if the email alerts are turned off at the project level
- FIX: Issue with scrollbars not displaying in reports for IE9
Projecturf 3.0.0 - April 26, 2011
Projecturf 3 contains significant improvements to the UI as well as the infrastructure. There are over 30 new features in version 3, including visual updates, user suggestions, security enhancements, database structures, and overall scalability improvements.
- NEW: Brand new tabbed interface and navigation system
- NEW: Projects can remain open in tabs, which can be re-arranged by dragging and dropping
- NEW: Advanced permissions that allow various access levels for users based on the project
- NEW: Add multiple items at once by using our new "add another" feature
- NEW: New instant searching added to most sections for immediate search results on the same page
- NEW: Can now run multiple timers for various projects at the same time
- NEW: The Global Calendar uses colors to differentiate projects (based on Color Label in Project Settings)
- NEW: Add time to Tasks and Tickets directly from the Task/Ticket itself by clicking on the Timecard icon
- NEW: Editing of records in Global modes
- NEW: Custom subdomains introduced
- NEW: Ability to turn SSL security on or off
- NEW: Significant improvements to the database structures and backend, resulting in drastic upgrades in page loading times
- NEW: Brand new Help Center with improved tutorials, FAQs, screenshots, support, and more